Power system capacity expansion planning model considering carbon emissions constraints
DOI:
https://doi.org/10.17533/udea.redin.12471Keywords:
carbon dioxide emissions, capacity factor, sustainability, capacity expansion planningAbstract
This paper presents a power system capacity expansion planning model considering carbon emissions constraints. In addition to the traditional technical and economical issues usually considered in the planning process, two environmental policies that consist on the taxation and the annual limits of carbon dioxide (CO2) emissions are considered. Furthermore, the gradual retirement of old inefficient generation plants has been included. The approach guarantees a cleaner electricity production in the expanded power system at a relatively low cost. The proposed model considers the transmission system and is applied to a 4-region and 11-region power systems over a 20-year planning horizon. Results show practical investment decisions in terms of sustainability and costs.
Downloads
References
H. Khodr, J. Gómez, L. Barnique, J. Vivas, J. Yusta, A. Urdaneta. “Linear Programming Methodology for the Optimization of Electric Power-Generation Schemes”. IEEE Transactions on Power Systems. Vol. 17. 2002. pp. 864-869. DOI: https://doi.org/10.1109/TPWRS.2002.800982
Z. Jinxiang, C. Mo-yuen. “A review of Emerging Techniques on Generation Expansion Planning”. IEEE Transactions on Power Systems. Vol. 12. 1997. pp. 1722-1728. DOI: https://doi.org/10.1109/59.627882
J. Panida, S. Chanan. “Reliability and Cost Tradeoff in Multiarea Power System Generation Expansion Planning Using Dynamic Programming and Global Decomposition”. IEEE Transactions on Power Systems. Vol. 21. 2006. pp. 1432-1441. DOI: https://doi.org/10.1109/TPWRS.2006.879248
S. McCusker, B. Hobbs, Y. Ji. “Distributed Utility Planning Using Probabilistic Production Costing and Generalized Benders Decomposition”. IEEE Transactions on Power Systems. Vol. 17. 2002. pp. 497-505. DOI: https://doi.org/10.1109/TPWRS.2002.1007924
J. Sirikum, A.Techanitisawad, V. Kachitvichyanukul. “A New Efficient GA-Benders’ Decomposition Method For Power Generation Expansio Planning With Emission Controls”. IEEE Transactions on Power Systems. Vol. 22. 2007. pp. 1092-1100. DOI: https://doi.org/10.1109/TPWRS.2007.901092
P. Young, W. Jong, P. Jong, K. Dong. “Generation Expansion Planning Based on an Advanced Evolutionary Programming”. IEEE Transactions on Power Systems. Vol. 14. 1999. pp. 299-305. DOI: https://doi.org/10.1109/59.744547
P. Jong, P. Young, W. Jong, K. Lee. “An Improved Genetic Algorithm for Generation Expansion Planning”. IEEE Transactions on Power Systems. Vol. 15. 2000. pp. 916-922. DOI: https://doi.org/10.1109/59.871713
J. Ceciliano, M. Yildrim, A. Masud. “A Model for the Multiperiod Multiobjective Power Generation Expansion Problem”. IEEE Transactions on Power Systems. Vol. 22. 2007. pp. 871-878. DOI: https://doi.org/10.1109/TPWRS.2007.895178
B. Hobbs. “Optimization methods for electric utility resource planning”. European Journal of Operational Research. Vol. 83. 1995. pp. 1-20. DOI: https://doi.org/10.1016/0377-2217(94)00190-N
J. Roy, M. Shahidehpour, Y. Fu. “Market-Based Coordination of Transmission and Generation Capacity Planning”. IEEE Transaction on Power Systems. Vol. 22. 2007. pp. 1406-1419. DOI: https://doi.org/10.1109/TPWRS.2007.907894
J. Roy, M. Shahidehpour, Y. Fu. “Security-Constrained Resource Planning in Electricity Markets”. IEEE Transactions on Power Systems . Vol. 22. 2007. pp. 812-820. DOI: https://doi.org/10.1109/TPWRS.2007.895174
Q. Chen, C. Kang, Q. Xia, J. Zhong. “Power Generation Expansion Planning Model Towards LowCarbon Economy and Its Application in China”. IEEE Transactions on Power Systems. Vol. 25. 2010. pp. 1117-1125. DOI: https://doi.org/10.1109/TPWRS.2009.2036925
J. Ceciliano, M. Yildirim, A. Masud. “A Multiobjective Evolutionary Programming Algorithm and Its Applications to Power Generation Expansion Planning”. IEEE Transactions on Systems, Man and Cybernetics . Vol. 39. 2009. pp. 1086-1096. DOI: https://doi.org/10.1109/TSMCA.2009.2025868
P. Murugan, S. Kannan, S. Baskar. “Application of NSGA-II Algorithm to Single-Objective Generation Expansion Planning”. IEEE Transactions on Power Systems. Vol. 24. 2009. pp. 1790-1797. DOI: https://doi.org/10.1109/TPWRS.2009.2030428
S. Kannan, S. Baskar, J. McCalley, P. Murugan. “Application of NSGA-II Algorithm to Generation Expansion Planning”. IEEE Transactions on Power Systems . Vol. 24. 2009. pp. 454-461. DOI: https://doi.org/10.1109/TPWRS.2008.2004737
D. Mejía, J. López-Lezama, L. Gallego. “Energy generation expansion planning model considering emissions constraints”. Revista DYNA. Vol. 77. 2010. pp. 75-84.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2018 Revista Facultad de Ingeniería
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Revista Facultad de Ingeniería, Universidad de Antioquia is licensed under the Creative Commons Attribution BY-NC-SA 4.0 license. https://creativecommons.org/licenses/by-nc-sa/4.0/deed.en
You are free to:
Share — copy and redistribute the material in any medium or format
Adapt — remix, transform, and build upon the material
Under the following terms:
Attribution — You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
NonCommercial — You may not use the material for commercial purposes.
ShareAlike — If you remix, transform, or build upon the material, you must distribute your contributions under the same license as the original.
The material published in the journal can be distributed, copied and exhibited by third parties if the respective credits are given to the journal. No commercial benefit can be obtained and derivative works must be under the same license terms as the original work.